A38 Verkehrsinfo: Reduction of lanes from January 29, 2024 to 02.02.2024 - All details here!

A38 Verkehrsinfo: Reduction of lanes from January 29, 2024 to 02.02.2024 - All details here!

Dear readers,

The traffic information for the A38 continues to keep us busy. From January 29, 2024 to 02.02.2024 there will be a reduction in lane due to the work on protective devices on the Göttingen directional lane between the Lützen junction and the Kreuz Rippachtal as well as between the Leipzig-Südwest junction and the "Fuchsaue" PWC system. During this time the traffic is stuck.

These construction measures will undoubtedly lead to delays and traffic jams, especially for commuters and everyone who regularly use the A38. It is important that the affected road users inform themselves in good time and, if necessary, consider alternative routes or means of transport.

This affects not only the direct residents along the A38, but also the entire region. The diversions and additional traffic flows could lead to bottlenecks on the alternative routes and burden the local infrastructure. In addition, companies that rely on a smooth transport of goods can have difficulty delivering their goods on time.

It is remarkable that the work on the protective devices is necessary to ensure safety on the highway. Nevertheless, it is important that planning and communication on the part of the responsible authorities are transparent and comprehensive in order to offer the citizens the necessary information and support.

It remains to be hoped that the construction work can be completed on time and without major incidents, so that traffic on the A38 can soon flow smoothly again. In the meantime, it is advisable to keep an eye on traffic reports and, if necessary, flexibly switch to the construction sites.

In the following you will find a table with additional information on the traffic disruptions on the A38:

| Date | Direction | Affected section | Type of blocking |
| ————— | ————————————————————— |
| 29.01.2024 | Göttingen | As Lützen - Kreuz Rippachtal | Railway reduction |
| 01.02.2024 | Leipzig-Südwest | As Leipzig-Südwest-PWC system "Fuchsaue" | Railway reduction |



Source: The Autobahn GmbH of the federal / OTS

Kommentare (0)