Berlin: Treskowallee between An der Wuhlheide and Karlshorst trotting racing track is fully closed due to construction work
Berlin: Treskowallee between An der Wuhlheide and Karlshorst trotting racing track is fully closed due to construction work
according to a report by www.berlin.de the Berlin water operations in Treskowallee between An der Wuhlheide and Trabrennbahn Karlshorst are removed. This leads to a full closure of the Treskowallee in this section, which is expected to take at least 10 weeks. The plants of the Berlin water operations are in a worrying state due to their age and stress due to traffic, which is why a speed limit to km/h is no longer sufficient to ensure traffic safety.
The planned work has an impact on traffic in this area. A detour via Rummelsburger Straße/Blockdammweg in the direction of Karlshorst has been signposted, and it is planned to set up an improved traffic routing via Treskowallee at a later date. In consultation with the Lichtenberg district office, the police, the fire brigade and the emergency services, these measures are planned to ensure security during the construction work. However, cycling and foot traffic will not be impaired.
As a citizen of Berlin, it is important to adjust to possible traffic impairments during this construction phase. The diversion and possible changed traffic tours can lead to increased traffic volume in neighboring roads. It is advisable to consider alternative routes and plan additional travel time to avoid delays.