Construction work at the Hirschgarten S-Bahn station: accessibility by 2026

Die Deutsche Bahn beginnt im September 2024 mit den Bauarbeiten am S-Bahnhof Hirschgarten. Ab Ende 2026 wird der Bahnhof barrierefrei erreichbar sein. Erfahren Sie mehr über die geplanten Veränderungen, notwendige Einschränkungen und weitere Details in unserem Artikel.
Deutsche Bahn begins in September 2024 with the construction work at the Hirschgarten S-Bahn station. From the end of 2026 the train station will be accessible. Find out more about the planned changes, necessary restrictions and further details in our article. (Symbolbild/MB)

Construction work at the Hirschgarten S-Bahn station: accessibility by 2026

conversion of the Hirschgarten S-Bahn station: a measure with far-reaching consequences

From September 2024, the Hirschgarten S-Bahnhof in Munich will be the focus of an extensive renovation. This step is not only a structural necessity, but also contributes to improving the quality of life for residents and passengers. The renovation will bring interesting changes that will take by the end of 2026 if the train station will be accessible for the first time by a new pedestrian tunnel.

At the center of the project is the construction of an elevator and the installation of ramps and stairs, which should enable easy use of the station for everyone. In addition, a soundproofing wall is built to reduce the noise level for the environment. Such measures can not only be seen as a technical necessity, but as part of a large trend towards more inclusion and sustainable infrastructure.

During the construction process, the fundamental commitment and progress symbolizes, however, some restrictions for the users of the train station and the residents have to be accepted. These changes can cause temporary challenges, which is why Deutsche Bahn is trying to understand those affected.

The importance of this project goes beyond the mere redesign of a traffic hub. It reflects the growing desire of society to ensure mobility for everyone and to make the urban space more human -friendly. Such developments are crucial for the creation of a modern and inclusive city structure.

A comprehensive project presentation in the download area is available for those interested, which provides more detailed information about the planned measures. Questions about the construction work can be addressed directly to angelika.britz@deutschebahn.com. Important information on building -related timetable changes is also available on the Deutsche Bahn website.

The conversion of the Hirschgarten S-Bahn station is an example of how necessary infrastructural improvements can have a direct positive influence on the life of people in the region. It is important to look at such developments in the context of the entire urban growth and to actively participate in discussions about the future of public transport.