Construction work stops rail traffic: RB36 between Beeskow and Frankfurt!

Construction work stops rail traffic: RB36 between Beeskow and Frankfurt!

From Friday evening, May 30, 2025, regional railway line 36 between Königs Wusterhausen and Frankfurt (Oder) will be interrupted for several weeks. This measure is necessary due to extensive construction measures by Deutsche Bahn. The blocking affects the section between Beeskow and Mixdorf and will continue until June 16. During this time there is a replacement traffic by bus to ensure the mobility of passengers. However, the trains between Königs Wusterhausen and Beeskow and between Mixdorf and Frankfurt continue to run once an hour with a reduced frequency. This leads to an extended travel time between Königs Wusterhausen and Frankfurt, which is now two hours and thirty minutes, which is one hour longer than usual.

such as rbb24. For the passengers, replacement traffic is also set up by buses that ensure the connection to Beeskow so that the connection trains of the RB36 can be reached.

construction work and their effects

The construction work at the Oegelner train station stop starts on May 30th and will continue until June 20. According to the [MOZ] (https://www.moz.de/lokales/beeskow/bahn-rb36-bau-wabout- and-frankfurt-OderbSp-Die-Folgen-78056298.html), comprehensive modernizations and the barrier-free conversion into Schneeberg and oegeln are planned. In Schneeberg, the work begins on May 19 and ends on June 20. The modernization measures include, among other things, adjustments to the sidewalks and the installation of new waiting houses in order to enable passengers to use the railway stations.

The effects of the construction work are not only limited to the aforementioned periods. From May 23, a train between Beeskow and Königs Wusterhausen will fail every day, which means additional inconvenience for the users of the regional train. The signal box in Beeskow also plays a role, since there are often train failures, especially in the evening.

accessibility and further improvements

The measures aim to increase the accessibility of the stops and improve their total quality. This also includes the planned renovation measures on other traffic stations along important railway lines. According to the information from DB, comprehensive work on the route between Hamburg and Berlin is planned for the period from August 2025 to April 2026. This work includes the general renovation of the infrastructure, including the renewal of tracks and the course and will have a noticeable effect for the regional rail drivers.

In particular, the barrier -free conversion should also increase the quality of stay at the train stations. These include new toilet facilities, weather protection houses and improved path control systems. With these extensive investments, not only the accessibility for people with mobility restrictions is improved, but also optimized the general usage experience for all travelers.

Details
OrtBeeskow, Deutschland
Quellen

Kommentare (0)