Full closure of Landsberger Straße: construction work from September 16 to 27

Full closure of Landsberger Straße: construction work from September 16 to 27

Important construction work in Mahlsdorf: Full closure of Landsberger Straße

As part of comprehensive renovation measures, Landsberger Straße in Mahlsdorf from 16. September to September 27, 2024 closed for all traffic. This measure is part of a long -term plan to improve the infrastructure in the region, which serves to increase traffic safety and the renewal of road damage.

Residents were informed about the upcoming restrictions in advance. In particular, access to private street Landsberger Straße 216a-216s is guaranteed at any time, which was organized in close consultation with those affected. This ensures that all residents also have access to their land during construction.

The possibility of waste disposal also remains unhindered. The responsible bodies have taken measures to guarantee the collection of waste containers or, if necessary, coordinate in advance. Such preventive steps are important in order to keep the inconveniences for the residents as low as possible.

As the street and green space office reports, BVG line traffic will not be affected by the work, which is of great importance for public transport connections. The residents can continue to rely on the usual connections, which supports a smooth everyday life.

These construction work is carried out by Horgas Steinstraßen and Wegbau GmbH, a company based in Oranienburg, which has experience in the implementation of such traffic projects. Cooperation with a reliable partner is crucial to ensure the quality and efficiency of the work.

The Marzahn-Hellersdorf district office asks for understanding for the resulting traffic restrictions. Your patience is appreciated because you contribute to an improved traffic infrastructure in Mahlsdorf, which ultimately benefits everyone involved.

The press contact of the Marzahn-Hellersdorf district office is available for further information and special inquiries:

  • District Office Marzahn-Hellersdorf of Berlin
  • street and green space office, 12591 Berlin
  • Head of Roads: Christian Rost
  • Email: sga-strassen@ba-mh.berlin.de

The implementation of this construction work underlines the need for urban improvements and shows how important the constant maintenance of roads is in order to continue to ensure a safe and user -friendly transport infrastructure in the future.

Kommentare (0)